We have done our best to list all of the Eagle Projects completed with the Mendon Foundation. If you see something missing, or if you would like to be in a future version of this list, please contact us.

YearScoutTroopProject
1997Trevor Jones10Cleaned and widened trail between RJ and Clover St
1999Christopher Colquitt10Erected 16 signs along the Lehigh Valley Trail
2002Davis Judson129Cleared south side of Mendon Station Park
2003Patrick Kelly129Built stairs at Mendon Station Park
2005Christoph Napp10Built kiosk at Rochester Junction. 24 scouts and parents participated in the project for a total of 400 hours.
2005Garrett Koek10Defined outline of station at Rochester junction, built a knee-wall, and created  picnic area on the Trail;  42 scouts and parents participated for a total of 337 hours
2006Liam Dooley10Rebuilt 30-foot  West Wye Bridge connecting the Trail and Great Bend Park; 382 hours
2006Evan Schmidt10Built 60′ of railroad track at Mendon Station Park
2006Dan Smith10Cleared & built 1920’s Station Master’s Garden at Rochester Junction
2006Ethan Gardner10Built interlocking tower and refurbished electrical box at Rochester Junction
2007Ethan Whritenor10Built seven benches on the Trail and cleared trailside trees and brush at seven locations
2007Stefan Napp10Built stairs and trail from West Wye foot Bridge to Dam
2007David Volzer10Built and installed 33 mileage markers on Lehigh Valley Trail
2008Jason Asarese10Built Speeder Shed knee wall and laid 20 feet of light rail;  275 hours
2008Bret Henderson10Weed eradication around the triangle platform at Rochester Junction
2008Jonathan Rice10Built kiosk in Rush. Cleared an area of 14’ X 10’ for the kiosk; dug post holes and poured cement pads; erected the PT 6” X 6” frame; built the roof; built the window and sign areas; stained the completed structure
2008Dave Schmittlenner334Built trail picnic area at intersection with Genesee Valley Greenway
2010Justin Gardner10Excavated foundation of pump house & built knee walls. 415 hours. The pump house was located over the summer of 2009, and a 30″ knee wall was erected around its foundation. A few trees, brush, etc., were also cleared around the area to gain a better view of the knee wall structure from the trail
2010Mike Knab10Beaver Pond Overlook on Lehigh Valley Trail (100 yards east of Clover St.)
2010Tommy Bock10Rush Station picnic area established; built one classic picnic table and one handicapped-accessible picnic table with attached benches and anchors; built two bluebird houses; cleared a 25’ by 20′ area with type 2 crushed stone base
2011Teddy Cost10Restored 1950s baggage cart at Rochester Junction
2011Ben Stewart10Built display shelter for  Baggage Cart at Rochester Junction
2011Colin Prato10Rebuilt a 65′ pathway in Mendon Station Park. Removed old materials; changed grade; deepened pathway base; laid out Geocell and grid and backfilled with base stone. Compacted base, installed edging, and more
2011Ian Jackson10Wreck display, Lehigh Valley Trail
2012Peter Newman10Bench and steps on Lehigh Valley Trail at Mendon Station Park
2012Nat McNabb10Display cover for baggage cart on Lehigh Valley Trail
2012Brad Alexander105Flagpole & gardens at Mendon Station Park
2012Wesley Davies105Mendon Foundation bench and Mendon Foundation Signage
2013Peter Carosa105Freight house: installed interior wall board, interior & exterior painting, insulation, drywall, interior finish carpentry, and coordination of the electrical work
2013Jacob Shanks10Baggage cart; refurbished Lehigh Valley Trail.
2014Killian Coddington105Rochester Junction “milepost” signage
2015Salvatore Carosa105Storage shelves for the Mendon Foundation equipment barn at the Mendon baseball fields
2015Brian Alexander105Concrete floor for the Mendon Foundation equipment barn at the Mendon baseball fields
2020Preston Yates105Bike repair station at Rochester Junction
2021Matthew Dobner10Bike Repair Station at Mendon Station Park