We have done our best to list all of the Eagle Projects completed with the Mendon Foundation. If you see something missing, or if you would like to be in a future version of this list, please contact us.
| Year | Scout | Troop | Project |
|---|---|---|---|
| 1997 | Trevor Jones | 10 | Cleaned and widened trail between RJ and Clover St |
| 1999 | Christopher Colquitt | 10 | Erected 16 signs along the Lehigh Valley Trail |
| 2002 | Davis Judson | 129 | Cleared south side of Mendon Station Park |
| 2003 | Patrick Kelly | 129 | Built stairs at Mendon Station Park |
| 2005 | Christoph Napp | 10 | Built kiosk at Rochester Junction. 24 scouts and parents participated in the project for a total of 400 hours. |
| 2005 | Garrett Koek | 10 | Defined outline of station at Rochester junction, built a knee-wall, and created picnic area on the Trail; 42 scouts and parents participated for a total of 337 hours |
| 2006 | Liam Dooley | 10 | Rebuilt 30-foot West Wye Bridge connecting the Trail and Great Bend Park; 382 hours |
| 2006 | Evan Schmidt | 10 | Built 60′ of railroad track at Mendon Station Park |
| 2006 | Dan Smith | 10 | Cleared & built 1920’s Station Master’s Garden at Rochester Junction |
| 2006 | Ethan Gardner | 10 | Built interlocking tower and refurbished electrical box at Rochester Junction |
| 2007 | Ethan Whritenor | 10 | Built seven benches on the Trail and cleared trailside trees and brush at seven locations |
| 2007 | Stefan Napp | 10 | Built stairs and trail from West Wye foot Bridge to Dam |
| 2007 | David Volzer | 10 | Built and installed 33 mileage markers on Lehigh Valley Trail |
| 2008 | Jason Asarese | 10 | Built Speeder Shed knee wall and laid 20 feet of light rail; 275 hours |
| 2008 | Bret Henderson | 10 | Weed eradication around the triangle platform at Rochester Junction |
| 2008 | Jonathan Rice | 10 | Built kiosk in Rush. Cleared an area of 14’ X 10’ for the kiosk; dug post holes and poured cement pads; erected the PT 6” X 6” frame; built the roof; built the window and sign areas; stained the completed structure |
| 2008 | Dave Schmittlenner | 334 | Built trail picnic area at intersection with Genesee Valley Greenway |
| 2010 | Justin Gardner | 10 | Excavated foundation of pump house & built knee walls. 415 hours. The pump house was located over the summer of 2009, and a 30″ knee wall was erected around its foundation. A few trees, brush, etc., were also cleared around the area to gain a better view of the knee wall structure from the trail |
| 2010 | Mike Knab | 10 | Beaver Pond Overlook on Lehigh Valley Trail (100 yards east of Clover St.) |
| 2010 | Tommy Bock | 10 | Rush Station picnic area established; built one classic picnic table and one handicapped-accessible picnic table with attached benches and anchors; built two bluebird houses; cleared a 25’ by 20′ area with type 2 crushed stone base |
| 2011 | Teddy Cost | 10 | Restored 1950s baggage cart at Rochester Junction |
| 2011 | Ben Stewart | 10 | Built display shelter for Baggage Cart at Rochester Junction |
| 2011 | Colin Prato | 10 | Rebuilt a 65′ pathway in Mendon Station Park. Removed old materials; changed grade; deepened pathway base; laid out Geocell and grid and backfilled with base stone. Compacted base, installed edging, and more |
| 2011 | Ian Jackson | 10 | Wreck display, Lehigh Valley Trail |
| 2012 | Peter Newman | 10 | Bench and steps on Lehigh Valley Trail at Mendon Station Park |
| 2012 | Nat McNabb | 10 | Display cover for baggage cart on Lehigh Valley Trail |
| 2012 | Brad Alexander | 105 | Flagpole & gardens at Mendon Station Park |
| 2012 | Wesley Davies | 105 | Mendon Foundation bench and Mendon Foundation Signage |
| 2013 | Peter Carosa | 105 | Freight house: installed interior wall board, interior & exterior painting, insulation, drywall, interior finish carpentry, and coordination of the electrical work |
| 2013 | Jacob Shanks | 10 | Baggage cart; refurbished Lehigh Valley Trail. |
| 2014 | Killian Coddington | 105 | Rochester Junction “milepost” signage |
| 2015 | Salvatore Carosa | 105 | Storage shelves for the Mendon Foundation equipment barn at the Mendon baseball fields |
| 2015 | Brian Alexander | 105 | Concrete floor for the Mendon Foundation equipment barn at the Mendon baseball fields |
| 2020 | Preston Yates | 105 | Bike repair station at Rochester Junction |
| 2021 | Matthew Dobner | 10 | Bike Repair Station at Mendon Station Park |